HOME | ABOUT US | DESI COMMUNITY | DFW COMMUNITY | CALENDER | USA | THE WORLD | PLURALISM | CRICKET | BLOG | MUSIC | ALBUM

NASIR MOHAMED

ASSOCIATED ENGINEERS GROUP

Consulting & Design Engineers, Bangalore,  India

Plot # 57/8, No. 9, First Floor, Roopena Agrahara Main Road, Bommanahalli, Bangalore-560 064

T: 080 2573 3786, 5771 7253. M-098 451 390 77 E-Mail: nasiraeg@yahoo.com, nasirdeg@yahoo.com

PROFESSIONAL PROFILE

ANNEXURE

BANGALORE | MUMBAI | KOLKATTA | NEW DELHI | CHENNAI | HYDERABAD

GOA | NASIK | PUNE | MADURAI | COCHIN

.

INTRODUCTION

The Associated Engineers Group (formerly Known as DEG Consultants established since 1986) and associated a number of professional designers and engineers, whose skills encompassed the entire range of Building Engineering Services required to undertake the construction of new facilities and /or the refurbishment, alteration or extension of existing facilities.

More than twenty-five years of experience in the engineering and services industry has given us a thorough understanding of the requirements of building owners and operators. We also understand the requirements of the occupants, whose environmental comfort conditions in energy efficient premises are part of the overall objectives of the company. Our involvement is often required even before a client has purchased the building as the company is regularly called in to undertake pre-acquisition surveys of plant and services. Thereafter, once the client has taken possession of their premises, we plan, design and assist in execution of occupational facilities to achieve the anticipated life and performance from the systems within the building, as well as the fabric itself. The core services that the company offers are:

Condition Surveys:

Pre-acquisition, dilapidations, and ongoing study and analysis of all services and plant

Technical Studies:    

Professional services

Service Design Support:
 

Production of drawings and specifications with site supervision and quality control of installation

Project Management:

Tasks, duties, and schedules tailored to client's requirements and budgets

Legislative Compliances:

Working to achieve the objectives of regulations that affect the building and property industries

Why use a Building Services consultant?

A degree in engineering and subsequent professional development is one of the most onerous in today's university curriculum. So why do so many people involved in the development, design, refurbishment, and use of buildings attempt to get by without them?

A classic case is of a Shopping Mall Property Manager who asked advice on a refurbishment he was planning in his establishment. When he knew the cost of following that advice he decided to deal directly with the contractor, who gave him everything he asked for. Unfortunately he hadn't asked for the right thing so almost the entire installation didn't complete in time with poor workmanship - in fact, it was a disaster. The remedial works he was forced to carry out were so costly - far in excess of the fees we or any other consultant would have charged. Regrettably this contributed to the cost escalation and loss of precious time.

This is an unfortunately commonplace story in the construction industry. So why do so many clients go to the contractor for the design of their building services?

We are a professional company within an industry that is becoming more sophisticated (despite the misconception held by some companies about building services engineers) and as such must strive to promote our standards of professionalism. We also wish to generate awareness that we are a cost effective component in the equation. The client gets what they want, from minimal to full design and monitoring on site.

Contractors will always give the client what they ask for, but as far as services design is concerned, most of them don't have the expertise to question the suggestions. A consulting engineer has the qualifications to investigate the total scenario to ensure that what is being proposed will actually work, and give the best overall economic solution.

It is in the interests of our profession to stress the financial benefits of using our services.

Effective Project scheduling

With premises being equipped with ever increasing degrees of technology, it is understandable that owners or users are unlikely to be able to execute - unaided - a true optimization of the life cycle costs of their building. It is therefore essential that a consultant such as us be brought on board at the earliest stage of a building's development, to provide:

An ability to produce specifications, which clearly identify every single item

We will then assist and guide a client at a level of input, throughout the life of the building if necessary. Having established clients' budgets and assessed the priorities from a Service point of view.

Before any service can be put out to tender it is necessary for the full extent of the project that is to be operational to be known. Then it is usual for us to have a substantial input into the appointment of the contractor to ensure a value-for-money agreement is reached.

From this point onwards the success of the project will depend on the contract conditions drawn up to protect the client in his commercial dealings with the contractor. This should embrace the contractor's entire duties and responsibilities, including behavior on site, position within the maintenance team, and even termination of contract for whatever reason. In some instances we recommend that a performance-related clause be written into the contract whereby all items of project are prioritized. In the event of a fault, repair or replacement must be carried out within the time specified under the priority scheme. Failure to do so will incur financial penalties - a condition which puts the onus onto the contractor to stock the appropriate replacement components.

“Our designs co-ordinate all inter related aspects of all systems, which was found useful for the Clients in containing the capital costs and the operational costs

The range of projects include Software development, BPO and Call-Centre facilities, R&D labs, Office Complexes, Banks, Shopping malls, Departmental Stores, Hotels, Hospitals, Residential & commercial buildings, Electrification of entire Townships etc.

A brief list of High Esteem Projects we have successfully designed and executed:

·              Software development facilities - IBM Global Services Centre, i2 Technologies, Sonata Software, Mascot Systems at Chennai, Agere Systems at ITPL

·              BPO-Call centers like – Fidelity Financial, IBM call center at ITPL, Thomson Financial, Ocwen Financial

·              R&D labs for Microsoft R&D Centre Phase I &II at Hyderabad,  Network Associates Phase-I&II, EMC2  at Brigade Software Park, Kennametal Widia R&D office at Bangalore 

·              Townships – Electrical & EH services for Karnataka Housing Board at Chikmangalore and surroundings Phase I, II & III

·              Banks-ABN Amro, Bank of Muscat, SBC Warberg, ING, Society General

·              Commercial Complex- Maruti Chambers Bangalore

The Systems were designed to suit the requirements of Clients and considering the competition in the respective cities to ensure most energy efficient and cost effective designs. Currently we are engaged in the design of office facilities for Kennametal Widia India Ltd all over India

We are familiar with National and international codes of practices

We request you to include us in the panel of your services consultants and give an opportunity to associate with you in your on-going projects.

Thanking you,

Yours Sincerely,

For ASSOCIATED ENGINEERS GROUP

Nasir Mohamed-Director

  

 

ANNEXURE -I

BRIEF LIST OF SELECTED PROJECTS

BANGALORE 

01)               R & D Office for Kennametal Widia India Limited, Bangalore

6000 Sft. Current Project    

·      Comfort Air conditioning

·      Electrical & Allied works

·      Structure Cabling – 2x80 nodes

·      Fire Detection & alarm system

02)                 Sales Office for Kennametal Widia India Limited, Bangalore

                          1800 Sft. Current Project

§         Comfort Air conditioning

§         Electrical & Allied works

§         Structure Cabling – 2x20 nodes

§         Fire Detection & alarm system

03)                 Interiors for Infrastructure Services Pvt. Ltd., Residence for GMR Group Bangalore  -21000 Sft-   Current Project     

§         Air-conditioning – Low side & Comfort AC (VRV Systems).

§         Electrical & Allied works

§         Structure Cabling – 30 nodes.

§         Power Conditioning System – 1x 5 KVA

§         Fire Alarm, Intrusion detection, CCTV

§         Plumbing & Sewage works

04)                 Fidelity Financial Phase-I at Embassy Golf links, Bangalore

150,000 Sft.  Completed September 2004

§         Air-conditioning – Comfort & Precision

§         Electrical & Allied works

§         Power Conditioning System – 3x300 KVA

§         Captive Power Generation – 2x2000 kVA

§         Structure Cabling – 4x1000 nodes.

§         Access Control, Intrusion detection, CCTV

§         Fire Detection & Alarm,

§         Pre-action sprinkler

§         Fire extinguishing,

§         Public Address (Paging)

05)                 Call Centre Facility for IBM Phase I & II at ITPL, Bangalore –23000+23000- Completed

§         Air-conditioning – Low side & Precision AC

§         Electrical & Allied works

§         Structure Cabling – 3x1200 nodes.

§         Power Conditioning System – 3x120 KVA

§         Fire Alarm, Access Control, and Intrusion detection, CCTV

§         Sprinklers / Hydrants

06)                 AGERE Systems at ITPL, Bangalore  -13000 Sft- Completed-2003

§         Air-conditioning – Low side & Comfort AC.

§         Electrical & Allied works

§         Structure Cabling – 3x200 nodes.

§         Power Conditioning System – 2x60 + 2x30 KVA

§         Fire Alarm, Access Control, and Intrusion detection, CCTV

§         Sprinklers / Hydrants

07)                 EMC2 at Brigade Software Park at Bangalore  -

              6500 Sft- Completed 2003

§         Air-conditioning – Low side, Precision AC & Comfort AC.

§         Electrical & Allied works

§         Structure Cabling – 3x200 nodes.

§         Power Conditioning System – 3x120 KVA

§         Fire Alarm, Access Control, and Intrusion detection, CCTV

§         Sprinklers / Hydrants

08)                 Ocwen Financial Solutions Pvt. Ltd. at ITPL, Bangalore– 2500 Sft -Completed -2003

§         Electrical & Allied works

§         Structure Cabling – 3x100 nodes.

09)                 Henkel Loctite India Pvt Ltd., at Bangalore  -10000 Sft-

Completed-2003

§         Air-conditioning – Low side & Comfort AC.

§         Electrical & Allied works

§         Structure Cabling – 150 nodes.

§         Power Conditioning System – 1x10 KVA +  1x 20 KVA

10)                 Nirvana Info Solutions at Sigma Technology Bangalore  -28,000 Sft- Completed                                                                                                               

§         Air-conditioning – Low side & Precision AC

§         Electrical & Allied works

§         Structure Cabling – 3x1200 nodes.

§         Power Conditioning System – 2x120 KVA

§         Fire Alarm, Access Control, and Intrusion detection, CCTV

11)                 Network Associates Phase I & II R & D lab facility at

              Raheja Millennia, Bangalore – 12,000 Sft + 12,000 Sft  Completed   

§         Air-conditioning - 160 TR + 160 TR

§         Electrical & Allied works

§         Structure Cabling. 3x120 nodes (Phase-I) + 3x120 nodes Phase2

§         Power Conditioning System – 2x120 KVA + 2x120 KVA

§         Fire Alarm, Access Control and Intrusion detection, CCTV

§         Sprinklers / Hydrants

12)                 Delphi Automotive System at ITPL Bangalore –

              30,000 Sft   - Completed

§         Air-conditioning – (Low side & additional for Lab)

§         Electrical & Allied works

§         Structure Cabling – 3x120 nodes.

§         Power Conditioning System – 2x120 KVA

§         Fire Alarm, Access Control and Intrusion detection, CCTV

§         Sprinklers / Hydrants

13)                 Thomson Financial (Prim ark India) Phase I & II at Raheja Pinnacle, Bangalore – 58,000 Sft + 13000 - Completed

§         Air-conditioning - 300 TR.+ 110

§         Electrical & Allied works for Phase II

§         Structure Cabling – 3x500 nodes.+ 3x150 nodes

§         Fire Alarm, Access Control, &, CCTV

14)                 IBM Global Services, Bangalore – 100,000 Sft –

              Completed in record 90 days

§         Electrical & Allied works / (2 MVA sub-station)

§         Air-conditioning 625 TR.

§         Structure Cabling – 3x1000 nodes.

§         Power Conditioning System – 1.4 MVA

§         Fire Alarm, Access Control & Intrusion detection, CCTV

§         Sprinklers / Hydrants

§         Captive power Generation – 2 MVA  

15)                 ABN AMRO BANK - 6000 Sft. - Completed –Jan 2002.

§         Electrical distribution

§         Air-conditioning.  Multi-zone Split - 50 TR.

§         Structured Cabling 200 Nodes Data & Voice

§         Power Conditioning System 60 KVA

§         Fire Alarm, Access Control, CCTV & Safety

§         EPABX - ISDN with provision for BRI interface

16)                 Jubilant Biosys Limited – 22000 Sft  - 45 days completed (Bio-Tech facility)

§         Electrical & Allied works

§         Air-conditioning 150 TR.

§         Structure Cabling – 200 nodes

§         Power Conditioning System – 220 KVA

§         Access Control

17)              Springdale Holdings Pvt. Ltd., Primrose Road  - 15000sft- Completed Jan-2001

§         Electrical & Allied works./ sub-station 250 kVA

§         Air-conditioning - Split units 30 TR.

§         Structure Cabling - 50 Nodes Voice & Data

§         EPABX - 6/32 ISDN    

§         Power Conditioning System - 2 x 5 KVA UPS

§         Fire Alarm, Access Control & Safety

§         Captive power Generation - 2 x 62.5 KVA –

§         Plumbing & Sewage works.

18)                 St. Joseph’s Staff Facility, Museum Road  - 13000sft- Completed April-2001

§         Electrical & Allied works

§         Air-conditioning

§         Building Automation

§         Structure Cabling

§         EPABX - ISDN/Voice Mail      

§         Power Conditioning System

§         Fire Alarm, Access Control & Safety

§         Captive power Generation         

19)                 i2 Technologies (India) Pvt. Ltd., Primrose Road  - 15000 Sft- Completed 1999

§         Electrical & Allied works

§         Air-conditioning – Multi-zone Split Scroll - 125 TR

§         Structure Cabling - 200 Nodes Voice & Data

§         WAN using 64 kbps link connected to STP through Dish

§         EPABX - ISDN with provision for BRI interface           

§         Power Conditioning System - 3 x 30 KVA UPS

§         Fire Alarm, Access Control - (6Door) FM-200 Extinguishing (Server Room)&Safety

§         Captive power Generation - 2x160 KVA.- Kohler.

§         Plumbing works

20)                 ELBIT Diagnostic lab - Infantry Road  - 5000 Sft - Completed. (1997)

§          Electrical distribution

§          Air-conditioning - 60 TR Air-cooled water chilled units.

§          Structured Cabling - 24 Nodes Voice & Data

§          Power Conditioning System - 120 KVA UPS.- SIEMENS

§          EPABX - ISDN with provision for BRI interface, Fire Alarm & Safety

§          Captive Power Generation - 250 kVA. - POWERICA

§          Electro - Magnetic shielding of MRI - ELSCINT.

21)                 BANK OF MUSCAT - 8000 Sft. - Completed -Sept.1998.

§          Electrical distribution

§          Air-conditioning.  Multi-zone Split - 50 TR.

§          Structured Cabling 30 Nodes Data & Voice

§          Power Conditioning System 60 KVA

§          Fire Alarm, Access Control, CCTV & Safety

§          EPABX - ISDN with provision for BRI interface

§          Captive power Generation 180 KVA

22)              PCL Mind ware - Vasant Nagar - 15000sft- Completed / 1996  

§          Electrical distribution

§          Air-conditioning - Multi-zone Split/Window AC - 100 TR.

§          Structure Cabling - 120 Nodes Voice & Data

§          WAN using 64 kbps link connected to STP through Dish.

§          Power Conditioning System - 2 x 40 KVA UPS - LIEBERT.

§          Fire Alarm & Safety

§          Captive power Generation - 250 KVA.- POWERICA

23)              PCL- Mindware- Bhaskar Plaza -15000sft.-Completed./1997

§          Electrical distribution

§          Air-conditioning - Multi-zone Split/Window AC - 100 TR

§          Structured Cabling - 120 Nodes Voice & Data

§          WAN using 64 kbps link connected to STP through Dish.

§          Power Conditioning System - 2 x 120 KVA UPS - LIEBERT.

§          Fire Alarm & Safety

§          Captive power Generation - 2 x 250 KVA - POWERICA.

24)              Sonata Software Ltd. - Bull Temple Road  - 40000 Sft. – 1996

§          (Completed Main systems & refurbishment of 20000 sft.)

§          Electrical distribution / Substation

§          Air-conditioning using Vapour Absorption Machine - 180 TR

§          Structured Cabling - 480 Nodes Voice & Data

§          Power Conditioning System - 2 x 120 KVA UPS

§          Fire Alarm & Safety

§          Captive power Generation - 2 Nos. 250 kVA. - POWERICA

25)                 Jindal Corporate Office- 6000 Sft.- Completed / 1996

§          Electrical & Allied works

§          Air-conditioning  -  Air Handling Units 40 TR.

§          Power Conditioning System - 2 x 15 KVA UPS

§          Fire Alarm, Access Control & Safety

 

MUMBAI

1)                  Sales Office for Kennametal Widia India Limited

             2000 Sft. Current Project

§         Comfort Air conditioning

§         Electrical & Allied works

§         Structure Cabling – 2x25 nodes

§         Fire Detection & alarm system

2)                Giant Hyper Market at In orbit Mall, Mumbai – 50,000 Sft Completed               

§           Electrical distribution

§           Air-conditioning – 250 TR.

§           Captive Power Generation – 0.5 KVA

§           Plumbing and Sanitary Services

§           Hydro pneumatic System

§           Networking

§           EPABX System / Access Control

§           Fire alarm System/ Access Control.

§           Fire Fighting using Fire Hydrants

§           Music & P.A System

3)                Ocwen Financial Solutions Pvt. Ltd.  I & II Phase At Spectrum

           Towers, Mindspace at Mumbai – 18,000 sft – Completed

§           Air-conditioning - 120 TR.(Design guidance)

§           Electrical & Allied works

§           Structure Cabling – 3x300 nodes.

§           Fire Alarm, & Access Control

§           Fire suppression-Inergen gas

4)                i2 Technologies (India) Pvt. Ltd., SEEPZ - 6000sft-

            Completion – 3 months

§            Electrical & Allied works

§            Air-conditioning - 5 x 8.3TR & 3 x 3 TR

§            Structure Cabling - 80 Nodes Voice & Data

§            Power Conditioning System - 3 x 20 KVA UPS

§            Fire Alarm, Access Control, Intrusion detection

§            FM-200 Extinguishing (100 lbs)

           6)          SBC Warburg  - 6000 Sft. – Completed.

§            Electrical distribution

§            Air-conditioning - 4 X 7.5 TR & 6 X 1.5 TR

§            Structured Cabling - 60 Nodes Voice & Data  

§            Power Conditioning System - 10 KVA UPS - LIEBERT.

§            Fire & intrusion detection & alarm.

§            EPABX - 16/32 Digital Key type - PANASONIC

§            Access Control - proximity (4 doors) 

           7)          ABN - AMRO Bank  - 20000 Sft. - Completed (2 months).         

§            Electrical distribution

§            Air-conditioning - Multi- zone Split AC - 100 TR

§            Structured Cabling - 100 nodes.

§            Power Conditioning System - 2 X 25 KVA & 2 X 40 KVA -

§            Fire Alarm & Safety

§            EPABX - 32/120 ISDN – SIEMENS

          8)           UBS – WARBURG DILLON READ- 8000 Sft. - Completed

§            Electrical distribution

§            Air-conditioning - 22.5 TR & re design of existing system.

§            Power Conditioning System - 30 KVA UPS - LIEBERT

§            Fire / Intrusion / Access Control - 5 doors.

§            Implementation of EPABX (NORTEL OPTION 11E &

§            Structure Cabling ordered by Bank.)

§            Fire Fighting - FM 200 flooding system.

 

HYDERABAD 

            01)       ICICI at Hi-tech City 40000 Sft. (CALL CENTRE) - Completed

§            Electrical distribution

§            Air-conditioning 240TR Air Handling Units.

§            Structure Cabling - 160 Nodes Voice & Data

§            Power Conditioning System

§            Fire Alarm & Safety/ Sprinkler System

            02)       MICROSOFT (II) Phase. Cyber gateway 25000 Sft. Completed

§            Electrical distribution

§            Air-conditioning 240TR Air Handling Units.

§            Structure Cabling - 160 Nodes Voice & Data

§            Power Conditioning System

§            Fire Alarm & Safety/ Sprinkler System

           03)        MICROSOFT R & D CENTRE. Hi-tech City 40000 Sft. Completed

§            Electrical distribution

§            Air-conditioning 240TR Air Handling Units.

§            Structure Cabling - 160 Nodes Voice & Data

§            Power Conditioning System

§            Fire Alarm & Safety/ Sprinkler System

     04)     HYPER MARKET For RPG Group – 50000sft – completion

§            Electrical distribution

§            Air-conditioning – 250 TR.

§            Captive Power Generation – 0.5 KVA

§            Plumbing and Sanitary Services

§            Hydro pneumatic System

§            Networking

§            EPABX System / Access Control

§            Fire alarm System/ Access Control.

§            Fire Fighting using Fire Hydrants

§            Music & P.A System

             05)      ABN - AMRO Bank  - 8000 Sft. - (Completed)

§            Electrical distribution / - 250 KVA Sub-Station

§            Air-conditioning 60 TR

§            Captive power Generation - 160 kVA

§            Networking – 60 nodes

§            EPABX – System – Lucent

§            Fire Alarm / Access /CC TV

           06)        SHANTA  BIOTECHNICS Pvt. Ltd.   4000 Sft. /Completed

§            Electrical distribution

§            Air-conditioning 1 x 7.5 TR & 5 x 3 TR Split units

§            Structure Cabling - 30 Nodes Voice & Data

§            Power Conditioning System - 15kVA UPS & SCVS

§            Fire Alarm & Safety, Access Control

§            EPABX - 8/32 with Voice Mail system

            07)       SHOW ROOM FOR  TBZ - 4000 Sft. Completed

§            Electrical distribution

§            Air-conditioning  - 32 TR

KOLKATTA

1)           Call Centre Facility for IBM Phase I–10000- Completed

§         Air-conditioning – Low side & Precision AC

§         Electrical & Allied works

§         Structure Cabling – 3x100 nodes.

§         Power Conditioning System – 3x40 KVA

§         Fire Alarm, Access Control, and Intrusion detection, CCTV

§         Sprinklers / Hydrants

NEW DELHI 

        01)           PCL - MINDWARE - OKHLA PHASE-I   - 30000 Sft. - Completed   

§         Electrical distribution

§         Air-conditioning using Air-cooled Water-chilling Units. ( 3 x 60 TR)

§         Structured Cabling - 350 Nodes Voice & Data

§         Power Conditioning System - 2 x 120 KVA - SIEMENS

§         Fire Alarm & Safety

§         EPABX - 48/240 ISDN with provision for BRI interface - TATA

§         Captive power Generation - 400 KVA & 250 KVA. - GREAVES

 02)            ING Bank, Cannaught Place -5000 Sft. - Completed

§         Electrical distribution

§         Structured Cabling - Token ring Network & WAN LINK - 64 kbps

§         Power Conditioning System - 10 KVA UPS - LIEBERT

§         Fire Alarm & Safety

§         EPABX - 10/40 ISDN - NORTEL OPTION 11E

§         Access Control Swipe (2 doors)

      03)            IIGM -30000 Sft. – Completed

§         Electrical distribution

§         PHE Services

CHENNAI.

            01)       MASCOT SYSTEMS - Area 55000 Sft. Completed - Aug’1998.

§         Electrical distribution & Substation - 500 kVA.

§         Air-conditioning - 200 TR - Screw Chillers & Energy storage system.

§         Structured Cabling - 600 Nodes Voice & Data with OFC backbone.

§         Power Conditioning System - 2 x 40 kVA & 2 x 80 kVA  (MG)

§         Fire Alarm & Safety, CCTV & Functional Music. Zicom

§         EPABX - ATM Interface-Alcatel

§         Captive power Generation - 750 kVA & 250 kVA.- KOHLER

           02)        GLOBUS STORES - Completed - Aug’1998.

§         Electrical distribution .

§         Air-conditioning using Air-cooled Water-chilling Units. ( 4 x 60 TR)

§         Structured Cabling - 20 Nodes Voice & Data.

§         Fire Alarm & Safety, CCTV & Functional Music.

§         EPABX - ISDN with provision for BRI interface

§         Captive power Generation - 500 KVA. 

GOA

01)       Goa State Co-op Bank Ltd.- 15000 Sft.- Current Project.

§         Electrical distribution

§         Air-conditioning

§         Structured Cabling - 20 Nodes Voice & Data

§         Power Conditioning System - 60 KVA UPS  & SCVS

§         Fire Alarm & Safety

§         Access Control  & Intrusion Detection 

NASIK

                         01)      HOTEL PLAZA - 64 Room ***Hotel - 72,000 SFT. (Completed)

§         Electrical distribution & substation - 500 KVA

§         Air Conditioning  - 250 TR Multi-zone Split AC

§         EPABX / Fire Alarm, MATV, CCTV etc.

§         Power Conditioning & Generation System

PUNE

           01)        ABN - AMRO BANK - PUNE - 12000 SFT. - Completed. 1996

           

§         Electrical distribution / Substation - 250 KVA

§         Air-conditioning  - Multizone split AC - 75 TR

§         Structured Cabling - 40 Nodes Voice & Data

§         Power Conditioning System - 20 KVA + 7.5 KVA - DB Electronics.

§         Fire Alarm & Safety

§         Captive power Generation - 1 No. 160 KVA. - POWERICA

§         EPABX  - 16/48 - ISDN - ALCATEL

§         Access Control - proximity (3 doors)

          02)         SOCIETE GENERALE - PUNE - 3000 SFT. - Complete.1997

§         Electrical distribution.

§         Air-conditioning  - Split AC - 25  TR

§         Structured Cabling - 24 Nodes Voice & Data

§         Power Conditioning System - 10 KVA + 7.5 KVA - DB Electronics.

§         Fire & intrusion detection  & alarm.

§         Captive power Generation - 1 No. 160 KVA. - (To be decided)

§         EPABX  - 8/32 - ISDN - ALCATEL

§         Access Control - swipe (3 doors)

MADURAI/COCHIN.

1)          Bharti Telecommunication Ltd – SWITCH ROOMS. Completed

§         Electrical Distribution

§         Air-conditioning  – 40 TR (Precision A/C)

§         Structure Cabling - 40 Nodes

§         Power Conditioning – 15 KVA

§         Fire Alarm, Access Control, and Intrusion detection.

§         Captive power generation – 100 KVA

 

    © MikeGhouse.net. All rights reserved.